Custom radar arch installed
- GSSeattle
- Supporting Member
- Posts: 88
- Joined: Fri Nov 15, 2019 3:37 pm
- Home Port: Anacortes Marina (Anacortes, WA)
- Location: Seattle
Just finished installing my custom radar arch. Tyler at Cascade Fabworks did an amazing job making my design a reality. Next up - installing the radar dome and getting the canvas cockpit brow cover built.
You do not have the required permissions to view the files attached to this post.
Greg
2000 Albin 28 TE "Turtle Express"
2000 Albin 28 TE "Turtle Express"
- Pitou
- Gold Member
- Posts: 1995
- Joined: Thu Feb 22, 2007 1:34 pm
- Home Port: Gloucester, MA
- Location: Essex, MA
Agreed, it looks quite nice and some very skilled weld stitching. Your fabricatator did a fine job.
It looks like you incorporated a bit of a cockpit shade / roof extension into it as well which looks propotionately pleasing. Curious, how much of an extension?
Looking forward to seeing things as this project moves along.
It looks like you incorporated a bit of a cockpit shade / roof extension into it as well which looks propotionately pleasing. Curious, how much of an extension?
Looking forward to seeing things as this project moves along.
kevinS
"drinking rum before 10AM makes you a Pirate, not an Alcoholic"
~ 2006 31TE / Hull# 221
Cummins QSC 8.3 / 500 hp
Former boat ~
~ 2002 / 28TE / Hull# 614
Cummins 6BTA 370 hp / Alaskan Bulkhead
April / '04 ~ May / '13
"drinking rum before 10AM makes you a Pirate, not an Alcoholic"
~ 2006 31TE / Hull# 221
Cummins QSC 8.3 / 500 hp
Former boat ~
~ 2002 / 28TE / Hull# 614
Cummins 6BTA 370 hp / Alaskan Bulkhead
April / '04 ~ May / '13
- GSSeattle
- Supporting Member
- Posts: 88
- Joined: Fri Nov 15, 2019 3:37 pm
- Home Port: Anacortes Marina (Anacortes, WA)
- Location: Seattle
Thanks Anthony! I'm looking forward to getting it finished.
Kevin - I'm liking the term 'proportionately pleasing'
The cockpit extension is going to provide good shade, and also a good overhang for when I'm trolling in the PNW liquid sunshine... For the arch I decided on 2 ft. high so I could still get paddleboards or an inflatable under. For the extension / shade I went 2 ft. back from the back tube of the arch. Just enough to provide some cover, without stressing the arch mounts, and where it won't get in the way fishing. The key was having my fabricator bend it to match the camber of the roofline for the arch and for the extension. Makes it look like it belongs on the boat.
Kevin - I'm liking the term 'proportionately pleasing'

Greg
2000 Albin 28 TE "Turtle Express"
2000 Albin 28 TE "Turtle Express"
- GSSeattle
- Supporting Member
- Posts: 88
- Joined: Fri Nov 15, 2019 3:37 pm
- Home Port: Anacortes Marina (Anacortes, WA)
- Location: Seattle
Update - took 2-3 months to get on the schedule and get the canvas work done. Crazy how far people are booking out. Updated pics with canvas, radar, antennas all installed. Now for haul out and bottom paint, then ready to go! Also got on the waitlist for bottom job in late Feb, finally got hauled out today...
You do not have the required permissions to view the files attached to this post.
Greg
2000 Albin 28 TE "Turtle Express"
2000 Albin 28 TE "Turtle Express"
- Pitou
- Gold Member
- Posts: 1995
- Joined: Thu Feb 22, 2007 1:34 pm
- Home Port: Gloucester, MA
- Location: Essex, MA
Worth the wait .. it looks great!
kevinS
"drinking rum before 10AM makes you a Pirate, not an Alcoholic"
~ 2006 31TE / Hull# 221
Cummins QSC 8.3 / 500 hp
Former boat ~
~ 2002 / 28TE / Hull# 614
Cummins 6BTA 370 hp / Alaskan Bulkhead
April / '04 ~ May / '13
"drinking rum before 10AM makes you a Pirate, not an Alcoholic"
~ 2006 31TE / Hull# 221
Cummins QSC 8.3 / 500 hp
Former boat ~
~ 2002 / 28TE / Hull# 614
Cummins 6BTA 370 hp / Alaskan Bulkhead
April / '04 ~ May / '13
- GSSeattle
- Supporting Member
- Posts: 88
- Joined: Fri Nov 15, 2019 3:37 pm
- Home Port: Anacortes Marina (Anacortes, WA)
- Location: Seattle
Started the project last October, but that's how these things go sometimes... Fabrication time, getting on the anodizer's schedule, finding weather windows to install over the winter, then the canvas lead time. It all adds up.
Greg
2000 Albin 28 TE "Turtle Express"
2000 Albin 28 TE "Turtle Express"